PRE-ENGINEERED BUILDINGS (PEB)
PRE-ENGINEERED BUILDINGS (PEB) Building Components are Pre-Planned as per project’s requirement, then Engineered & Fabricated/Produced at Factory’s workshop & later assembled at the Construction Site!
Know Well To Decide Well About PEB vs. CONVENTIONAL
- AVERAGE DELIVERY TIME - For PEB, it takes 6 to 8 Weeks & for Conventional, it takes 20 to 26 Weeks
- Pre-Assessment or ERECTION TIME & COST - For PEB, it’s +90% Accurate & for Conventional there’s +/- 30% Variation, being 20% more costly than PEB
- ERECTION PROCESS - For PEB, it’s Easy & Fast, done Step-By-Step, but for Conventional, it’s Complex & Slow being more Labour Intensive
Advantages Of Using Steel Structural Material
- The steel has high strength having resistance to bear high loads.
- The steel being compact in size can be conveniently handled and transported.
- The pre-fabricated steel components facilitate ease of handling and erection.
- The steel components can be readily disassembled or replaced.
- The steel structures may be inspected quickly and conveniently.
- This material may be reprocessed/recycled in furnaces.
- Steel possesses high ductility, suitable for earthquake resistance structures.
Benefits of Pre-Engineered Warehouses
- Design time is significantly reduced
- Savings in manufacturing and site erection cost
- Easily flexible for future expansion
- Upto 90 mtr. large and clear spans possible
- Long durability and low maintenance costs
- Energy efficient roof and wall systems
- Full building package can be sourced from a single vendor